The assembly of ski-lift pillars, antennas or electricity pilons is improved by precise planning in advance. Furthermore we try to reduce the amount of flying time to a minimum by coordinated and perfectly timed working. Important information and work done in the run-up:
- Sea-level of place of assembly and determination of place of leading
- Number of assemblies
- Determination of order of assemblies and numbering of parts
- Work planning among assembly workers
- Preparing pedestals, safety ropes, for necessary precautions
Our professional team does the rest of the job for you. The assembly parts are prepared for easy assembly and, whenever required, ropes and/or pins are fixed for precise fitting. Equipment: Service truck, straps, chains, electric hooks, personal protective equipment
Pay load table
Height on Sea
|
SA 315* LAMA |
AS 350 B2* Ecureuil |
AS 350 B3* Ecureuil |
| 1.000 m |
800 kg |
850 kg |
1.150 kg |
| 1.250 m |
800 kg |
800 kg |
1.130 kg |
| 1.500 m |
800 kg |
800 kg |
1.070 kg |
| 1.750 m |
800 kg |
750 kg |
1.020 kg |
| 2.000 m |
800 kg |
750 kg |
980 kg |
| 2.250 m |
750 kg |
750 kg |
970 kg |
| 2.500 m |
750 kg |
700 kg |
900 kg |
| 2.750 m |
750 kg |
650 kg |
870 kg |
| 3.000 m |
700 kg |
600 kg |
800 kg |
| 3.250 m |
700 kg |
550 kg |
760 kg |
| 3.500 m |
650 kg |
500 kg |
710 kg |
|